Power

500 KM, 20 kV/0.4 kV KABUL SOUTH WEST DISTIBUTION NETWORKS

KABUL, AFGHANISTAN
Client: DA AFGHANISTAN BRESHNA SHERKAT (DABS)

Design, supply, installation, testing and commissioning of power distribution network for Kabul South West. 145km of MV lines, 265 Distribution transformers and 350 km LV ABC lines, supply and distribution of transformers, LV panels, LV/MV cables/accessories, ACSR conductors/accessories, concrete/steel poles/assembly accessories, electronic meter, meter boxes, MV switches and fuses.

We also built and the operated a pre-stressed concrete pole factory in Afghanistan. This is a 3 Mil USD worth of equity investment and we have created jobs for more than 100 blue collar and white collar employees. We have manufactured more than 13.000 pre-strressed concrete poles for our own project.

ÖDEMİŞ-KONAKLI MUNICIPALITY LV + HV POWER INSTALLATION

İZMİR, TURKEY
Client: GEDİZ ELEKTRİK DAĞITIM A.Ş.

Construction of overhead High Voltage transmission and medium and Low Voltage underground distribution lines in Odemis and Konakli districts of İzmir Province in Turkey including; 154kV transmission line, comprised of 19km of stringing of double circuit, 795 MCM ACSR conductor, Fabrication and erection of 2,700 tons of steel, 31km of 6.3kV and 0.4kV underground distribution lines, Partial refurbishment of existing 0.4kV underground distribution lines, 1x154kV Switchyard Modification, 3x34.5kV Substation Renovation, Site Tests and Commissioning, Erection and installation of 45 in city distribution substations.

1540 MW GAS FIRED COMBINED CYCLE POWER PLANT

İZMİR, TURKEY
Client: INTEGREN-ENKA

Civil works of cooling towers, switchyard, construction of salt field, infrastructure and earth works, BOP construction works (water treatment building, pre-treatment unit, pipe racks, filter, slurry thickeners, slurry sump, fire/filtration water tank, neutralizing tank, potable water tank, clear well tank, sodium hypo-chloride unit, chemical waste sump, valve room etc.), earthing, site civil works and perimeter fencing.

CONSTRUCTION OF FAIZABAD HYDROPOWER STATION

FAIZABAD, AFGHANISTAN
Client: MINISTRY OF ENERGY AND WATER (MEW) OF AFGHANISTAN

Design and build contract for a turnkey construction of 7,6 MW Hydro Power Plant (3 x 2,54MW - Vertical Axis Kaplan-Type). All Civil Works, Hydraulic Steel Structures, Electromechanical Equipments, Electrical Balance of Plant, Mechanical Balance of Plant.

380 kV AIR INSULATED SWITCHYARD

İZMİR, TURKEY 
Client: GEDİZ ELEKTRİK DAĞITIM A.Ş.

Design & Construction of 380kV Switchyard including Civil Works (excavation, foundations, trenches, control bldg, earthing, steel structures) and Electrical Works (primary equipment installations, protection & control system, RTU & Telecommunication System, AC/DC Auxiliaries, cabling, lighting, lighting protection, testing & commissioning etc.

1409 MW GAS FIRED COMBINED CYCLE POWER PLANT

BURSA, TURKEY
Client: TÜRKİYE ELEKTRİK ÜRETİM İLETİŞİM A.Ş. (TEAŞ)

The works included all infrastructural works such as 18 km asphalt paved roads, 422 km pipelines with diameters 2” – 6”, water treatment facilities, storm water – waste water – industrial waste water – potable water and fire protection networks, illumination and HVAC cabling, heating center, fuel gas station, foam tank and fuel oil pump house buildings, meteorology station, watching towers, concrete pads and foundations of turbines.