PRISTINA , KOSOVO
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
Construction of Prefabricated Accommodation Blocks with 602 beds, demolishment of existing buildings and replacing new ones, including all civil, electrical, plumbing, electromechanical, fire-systems and control works.
In general, the project consists of :
KABUL, AFGHANISTAN
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
Design and Build of Facilities for Kabul Military High School
KABUL, AFGHANISTAN
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
Design and Build of Kabul Military Training Center (KMTC) Shooting Range
KABUL, AFGHANISTAN
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
The project consists of the demolition and removal of the existing building and build a new Pediatrics and Women’s Wellness Centre (PWWC) at the Kabul National Military Hospital (KNMH). The facilities include Administration Unit services, Pediatrics Wellness Unit, Obstetrical and Gynecological Unit, Day Care areas, Outside areas.
KABUL, AFGHANISTAN
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
Design and implementation of all necessary renovations to Building 300 (1800 m2) so that it will meet the architectural, mechanical, electrical, CIS and furniture requirements of three hundred and twelve (312) NATO RS Administrative Personnel.
KABUL, AFGHANISTAN
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
Design and Build turnkey Reinforced Concrete blast proof structure building. Information System (CIS) facility used for Afghanistan Mission of ISAF (International Security Assistance Force) at Kabul International Airport
KABUL, AFGHANISTAN
Client: UK WORKS GROUP ROYAL ENGINEERS
Design and build turnkey life support facility for 400 people including 4 modular buildings, hospital, garage, workshops, mast towers, water system, electric service, sewer, information system, fuel station, armory, perimeter wall and other defensive systems.
Design and Construct a complete Hazmat Yard including concrete slabs, overhead cover, fence & gates, blast protection, and electric service at Delaram.
KUNDUZ, AFGHANISTAN
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
Design and Build turnkey 5 no. (6,500 m2) reinforced concrete blast proof structure buildings and including Security Systems, IT, CCTV, furniture, landscaping for ISAF (International Security Assistance Force). Operation & Maintenance services was also provided.
Design-Build Project consisting of all structural, mechanical, electrical, IT glazing and finishing elements of an authority supplied Visual Control Room (VCR) at height of 26m. above ground level.
JALALABAD, AFGHANISTAN
Client: U.S. ARMY CORPS OF ENGINEERS (USACE)
Design and Build a new camp facilities including site development, storm drainage, water storage and distribution system, sewage and treatment system, power generation, DFAC facilities, barracks, shower and latrine facility.
KABUL, AFGHANISTAN
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
Construction of 1,400 meters long, 7 meters high force protection blast-mitigating perimeter wall and guard towers at ISAF (International Security Assistance Force).
KABUL, AFGHANISTAN
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
Design and Build Entry Control Point with Guard Tower, Blast mitigation walls, K-Rated Barricades, Vehicle Scanning Portal with infrastructure for ISAF (International Security Assistance Force).
CAMP BASTION, AFGHANISTAN
Client: UK WORKS GROUP ROYAL ENGINEERS
Design-Build project consisting of all infrastructural and super structural works. The scope of this project includes 4,560 m2 Bulk Item and FRP Storage Building, 2,025 m2 two storey electronic workshop , ECM and Armory Building (EEA), 1,510 m2 Winch Test Area, landscaping works such as external pavement, perimeter fencing works and all associated external infrastructural works.
Design and Build turnkey 5. No (15,000 m2) reinforced concrete blast proof structure buildings and including Security Systems, IT, furniture, landscaping for ISAF (International Security Assistance Force)
Design and Build a new dining facility feed up to 1.500 soldiers and officers for breakfast, lunch and dinner. ( including refrigirated hygenic food storage places )
CAMP BASTION, AFGHANISTAN
Client: UK WORKS GROUP ROYAL ENGINEERS
The project consists of removal, cleaning of approx. 10,030 m2 matting, construction of 43,300 m2, 25 cm in thickness of un-reinforced Pavement Quality Concrete (PQC), construction of 300 m HESCO walls, 400 m road, drainage system, painting of taxiway lines and installation of aircraft earthling points.