VUSHTRRI, KOSOVO
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
Design and Build of a Glass-Fused-to-Steel Cylindrical Water Tank of 850 m3 with diameter of 11mt. Design and Build of the Waste Water Treatment Plant upgrade with two Sequencing Batch Reactors of a capacity of 2x90 m3/day (2x400 people). Reinforced concrete pad works, waste and water pipes installation, electrical installations according to ISO 9001 quality standard.
TRIPOLI, LIBYA
Client: ORGANIZATION FOR DEVELOPMENT OF ADMINISTRATIVE CENTERS (ODAC)
Design and Construction of 5 each General Storage facilities and 4 each Chemical storage facilities, their inregrated solid waste management systems for the Tripoli University Compound.
İZMİR, TURKEY
Client: KLEMSAN A.Ş.
Design and construction of all civil / architectural / electrical / mechanical and automation works for Manufacturing Plant of Electrotechnical, Electronics and Wire & Cable Management products.
CAMP BASTION, AFGHANISTAN Client: SUPREME GROUP
Construction of 6 each Jet Fuel Steel Tanks with total capacity of 30 million liters, 8km 6”jet fuel pipeline.
KABUL, AFGHANISTAN
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
Design and construction of Waste Water Treatment Facility at KAIA: earthworks, concrete underground structures, steel structures, mechanical & electrical works, utility connections (power, water, sewer, drainage), Communications & Information Systems (CIS), initial training, testing & commissioning, operation & maintenance.
Facility is designed to clean up to 16 vehicles, 7 containers and 1 generator per day on the basis of water recycling. Project also includes borehole, water catchment chambers, offices, drying room, storage containers.