KABUL - AFGHANISTAN
ONGOING
Client: THE MINISTRY OF URBAN DEVELOPMENT AFFAIRS (MUDA) – KFW - FICHTNER
Construction of reinforced concrete water reservoirs having useful storage capacities of 5.000 m³ including all civil works, pumping stations, hydraulic equipments, distribution pipelines and access roads.
PIRISTINE - KOSOVO
2018
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
The projects consists of, design, supply and Implement and commissioning of the upgraded waste water treatment plant.
Also decommissioning disposal of the existing rotary bio disc.
CITY-WATER SUPPLY SYSTEM - FAIZABAD - AFGHANISTAN
2016
Client: THE MINISTRY OF URBAN DEVELOPMENT AFFAIRS (MUDA) – KFW - FICHTNER
Construction of reinforced concrete water reservoirs including all civil works, pumping stations, hydraulic equipments, distribution pipelines and access roads.
KABUL - AFGHANISTAN
2014
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
Design and Build of Waste Water Treatment Facility at KAIA: earthworks, concrete underground structures, steel structures, mechanical & electrical works, utility connections (power, water, sewer, drainage), Communications & Information Systems (CIS), initial training, testing & commissioning, operation & maintenance.
HERAT - AFGHANISTAN
2014
Client: NATO SUPPORT AND PROCUREMENT AGENCY (NSPA)
Design, construction and restoration of the runway and hammerhead to ensure present and future execution of assigned theatre-level critical capabilities and allow a smooth redeployment of troops and equipment from the ISAF western region through the FSB.